Bid Documents
- Bid Results – Bid 635 ACHS & HHS Stadium Bleachers Lighting Sound
- Enterprise Construction Bid Response Bid 635 ACHS & HHS Stadium Bleachers Light Sound
- Pars Arvin Bid Response Bid Package – OUHSD -Adolfo Camarillo HS and Hueneme HS Stadium Bleachers and Lighting
- Byrom-Davey Bid Response Bid 635 Adolfo Camarillo HS & Hueneme HS Stadium Bleachers, Lighting & Sound System
- ADDENDUM 4_ACHS Bleachers
- ADDENDUM 4_ACHS Stadium Lighting
- ADDENDUM 4_HHS Bleachers
- ADDENDUM 4_HHS Stadium Lighting
- Addenda Acknowlegement Form – Bid 635 TO BE TURNED IN WITH BID
- Addendum 3 Bid 635 ACHS Bleachers
- Addendum 3 Bid 635 ACHS Stadium Lighting
- Addendum 3 Bid 635 HHS Bleachers
- Addendum 3 Bid 635 HHS Stadium Lighting
- Sign In Sheet Bid 635 Job Walk 9-24-2020 ACHS & HHS Stadium Bleachers Lighting & Sound
- Revised Bid Form Document 00 41 13 for Bid 635 ACHS & HHS Stadium Bleachers Lighting & Sound System
- Addendum 2 Bid 635_ACHS Bleachers
- Addendum 2 Bid 635_ACHS Stadium Lighting
- Addendum 2 Bid 635_HHS Bleachers
- Addendum 2 Bid 635_HHS Stadium Lighting
- Addendum 1 Bid 635_HHS Bleachers
- Addendum 1_Bid 635 HHS Stadium Lighting
- Addendum 1_Bid 635 ACHS Bleachers
- Addendum 1_Bid 635 ACHS Stadium Lighting
- Bid 635 ACHS & HHS Stadium Bleachers Lighting & Sound System
- Notice to Bidders Bid 635 ACHS & HHS Stadium Bleachers Lighting & Sound System
ACHS Drawings, Specifications, Geotech
- 03-120336_DWG_ACHS_Lighting
- 03-120480_DWG_ACHS Bleachers
- 03-120480_SPC_ACHS Bleachers
- Geotechnical Report_ACHS Bleachers
- Geotechnical Report_ACHS
HHS Drawings, Specifications, Geotech, Grading
- 03-120337_DWG_HHS Lighting
- 03-120507_DWG_HHS Bleachers
- 03-120507_SPC_HHS Bleachers
- Geotechnical Report_HHS Bleachers_03-CGS4324
- Geotechnical Report_HHS_03-CGS4097
- GER Supplemental Grading_HHS Bleachers_03-CGS4324
ACHS $1,769,322
HHS $3,236,094
Only the contractors bidding as prime need to attend. Although you can attend to view the site(s) if you are interested. A sign in sheet of attendees will be posted on the District website following the job walk.
Since there are two schools, should we provide two bid bonds for each school or one?
A single bid bond. It is a single price and a single contract.
Yes, that is correct.
This limit is applied on a per bid basis. For each bid number, the limit applies and it is not cumulative.
Prime only.
There are two E-200 sheets one dated 2/11/20 and the other 7/22/20. Please clarify.
There are two E-200 sheets because there are two separate projects with two different A#. No clarification needed.
Sheet E-200 date 7/22/20 has the wrong scale. Please correct.
The issue with the scale will be addressed via Addendum.
No revision will be made for this note. Bidders need to bid as they see fit.