Bid Documents
- Consent O. Board Mtg Cover Memo Approve Award Bid 608 ACHS Stadium Sitework BM 11-13-19
- Ohno Bid Response Bid 608 ACHS Stadium Sitework
- Bid Results – Bid 608 ACHS Stadium Sitework
- Sign In Sheet 11-12-19 Bid 608 ACHS Stadium Sitework
- Addendum #4 ACHS Bid 608 Stadium Sitework
- Addendum #3 ACHS Bid 608 Stadium Sitework
- Addendum #2 ACHS Bid 608 Stadium Sitework
- Addendum #1 ACHS Bid 608 Stadium Sitework
- Division 01 – ACHS General Requirements
- Notice to Bidders Bid 608 Stadium Sitework ACHS
- Bid 608 Stadium Site Work ACHS
- ACHS 03-120008_INC 01_103_A
- ACHS 03-120008_INC 01_DWG_A
- ACHS 03-120008_INC 01_SPC_A
Please see Addendum #2 which changes job walk to NOT mandatory.
Please see link at bottom of web page https://rfpou.oxnardunion.org/purchasing-warehousing/
Pursuant to Public Contract Code section 20111.6, only prequalified bidders will be eligible to submit a bid for contracts $1 million or more using or planning to use state bond funds. Any bid submitted by a bidder who is not prequalified shall be non-responsive and returned unopened to the bidder. Moreover, any bid listing subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered.
Please see addendum 4 that corrects those. Thank you.
https://rfpou.oxnardunion.org/news/rfp/bid-608-stadium-sitework-achs/
Per Addendum No. 1, the contractor needs to supply a new scoreboard. Please provide a specification and model number for the scoreboard.
Please see addendum 3 posted online. https://rfpou.oxnardunion.org/news/rfp/bid-608-stadium-sitework-achs/
Several subcontractors are asking for additional time to develop their bids for this project, especially in light of Nov. 11 being a holiday for most businesses. Would the District consider postponement of this bid, preferably to Wed., Nov. 20?
The Board of Trustees and District Administration feel it is in the District’s best interest to expedite this particular bid deadline and intends to award this bid on 11/13/19. The District does not intent to postpone the bid due date.
Reference: Sheet C5.2, Notes re: sleeves for storm drain pipe Question: The notes in blocks and also the un-numbered note on the left side of this plan sheet state that new storm drain pipes at ‘track crossing locations’ and ‘under new track’ are to be installed with sleeves. Does the sleeving only need to be placed on those sections of pipe that are directly under the track lanes, or does the sleeving also need to be placed on the sections of pipe that run under the D zones and the corners of the field?
C5.2 clouded note delta 4 added by Addendum 4 is the only info on the Bid Documents. Beyond that they you will have to bid it as you see it.
There is note on sheet C1.0 inside a box that is titled: “ Contractor to include in their bid”. That note requires the contractor to prepare the SWPPP, prepare the SWPPP manual, file with the State Water Quality board, and pay the necessary fee. The SWPPP must be prepared by a certified QSD which will be attained by the contractor for the project. The Contractor also will be responsible for attaining a certified QSP to monitor the SWPPP during the construction and to file all of the necessary reports through the ‘SMARTS’ system with the State Water Quality Board. Attached is a snapshot of that note for reference.